Downtown Chandler Growth

  
Olympus Steelyard is an apartment community in Downtown Chandler with an urban, upscale vibe. Located near Arizona Avenue and Frye Road, the 300-unit complex incorporates the City’s history and industrial feel in its décor.

Alta San Marcos is the newest multi-family property in Downtown Chandler and is located along the south side of Chandler Boulevard, just a few blocks west of Arizona Avenue. This luxury multi-family community consists of 273 units with architecture inspired by East Coast brownstone houses. 

A mixed-use residential and commercial development, called DC Heights, will be located at the southwest corner of Commonwealth Avenue and California Street. This project will be home to 250 new apartments and some retail.

  

Sharp, modish, curb appeal is underway at Overstreet, Downtown Chandler’s imminent shopping, dining and entertainment destination. Developed by MDB Properties, Overstreet is driven by Arizona-based LGE Design Build. The 77,000 square-foot project is anchored by the state's first and only FLIX BrewhouseTenant improvements on the ground floor are underway, with anticipated openings in the fall and winter of this year. Tenants will include Screamery, Truland Burgers & Greens, Over Easy and ShareTea. View Overstreet brochure.

Las Palmas Cantina brings the flavors of the Mexican Riviera to Downtown Chandler. Located at 95 W. Boston Street, Las Palmas opens daily at 4 p.m.

The QuartHaus is the newest addition to Downtown, featuring 25 taps of the finest craft beers and eight wines on tap. Located at 201 S. Washington St.

Sasha's Kitchen and Cocktails is a new and exciting concept with a contemporary, casual atmosphere, affordable dining, and re-invented American cuisine. Located at 81 W. Boston St.

Puro, located at 111 W. Boston St., this three-story concept features a restaurant, cigar lounge and rooftop bar. West Alley BBQ is located on the first floor of this location. 

Ghett Yo Taco features street tacos with all the fixings located at 241 S. Oregon St.

Crust Pizza is now located at the Crowne Plaza San Marcos in Downtown Chandler. Stop by this delicious restaurant for lunch, happy hour, or dinner. Sneak below Crust in the evening and enjoy the newly opened, The Ostrich, a speakeasy-style basement lounge.

The Brickyard Downtown, an upscale and contemporary restaurant and bar, is located at 85 W. Boston St.

The Local Chandler, nestled next to The Perch, is a sports-themed restaurant and lounge. 

Crisp Greens is a unique concept that offers fresh salads, wraps and other tasty selections with fast, friendly service.

Site 7: The Request for Proposal has recently been awarded to LGE Design. More information to come.
 

      

Downtown's newest office development project, called New Square, consists of a three-story, 47,000-square-foot office building, an 8,700-square-foot retail building and a 112-bed Hilton Garden Inn. Phase II will consist of a five to eight stories of additional office. This project is on the west side of Arizona Avenue, across from City Hall. View the New Square project brochure.

    

Revint Solutions moved into the second floor office space at the Overstreet development in August 2019. 

 

 

Arizona Avenue

  • The City has completed various roadway and streetscape improvements to Arizona Avenue between Frye and Pecos roads. The streetscape improvements are part of a larger vision to enhance the pedestrian-friendly feel of the City's core and a new entryway, or "front door", into downtown from the Loop 202/Santan Freeway.

 

Dakota/Commonwealth Project

  • The extension of Dakota Street between Commonwealth Avenue and Buffalo Street added another north-south arterial through the Downtown, improving traffic circulation and adding connectivity for the various multifamily projects, including Alta San Marcos and future DC Heights apartment project. Improvements to Commonwealth Avenue and adjacent SRP canal have brought more walkability to Downtown while introducing a historical look at Chandler’s canal system and its importance to the community’s early development. Both projects have won numerous awards.
     

The Courtyard
 

Oregon Street Parking Garage

  • Construction on the new $20 million, five-level, 293,000-square-foot Oregon Street parking garage is underway. The project also includes a road realignment along Oregon Street as well as intersection improvements at Arizona Avenue and Chicago Street. Upon completion in November 2019, this will be Downtown Chandler’s largest garage with 932 parking spaces, adding much needed parking options for those accessing City Hall as well as restaurants and other venues in the bustling area. The structure is located to the west of City Hall across Arizona Avenue on the northwest corner of Chicago and Oregon streets.